Tagbas Technical Nig Ltd. executed the sectional replacement of the Oshie 3T Flowline for NAOC, addressing pipeline degradation and ensuring optimal flow performance. The project involved the safe isolation of the affected line, precise cutting and removal of damaged sections, fabrication and welding of new pipeline segments, non-destructive testing (NDT), coating, and reinstatement.
All operations were conducted in strict adherence to NAOC’s health, safety, and environmental (HSE) guidelines, with a strong emphasis on minimizing downtime and preventing environmental impact. The successful completion of this project restored full line functionality and reinforced the integrity of the pipeline network in the Oshie area.