Ourn Project References
Oshie 3T Flowline Sectional Replacement
Tagbas carried out the sectional replacement of the Oshie 3T Flowline for NAOC. The project involved the removal of damaged pipeline sections and installation of new segments to restore full operational integrity. All works were executed with precision, ensuring minimal disruption, enhanced flow efficiency, and compliance with industry safety and quality standards.
Akri Health Center Construction & Commissioning
Tagbas delivered the full construction and commissioning of the Akri Health Center for NAOC, providing a fully functional healthcare facility to serve the host community. The project included building works, utility installation, and medical facility setup, supporting NAOC's commitment to community development and improved healthcare access.
Slab Work at Unit 720, OB/OB Gas Plant
Tagbas executed the construction of reinforced concrete slab work around Unit 720 API Skimmer at NAOC's OB/OB Gas Plant. This project enhanced the operational environment by improving structural integrity, accessibility, and safety within a critical processing area.
Repair/Section Replacement of Vandalized 18 inch X83 Km Pipeline at ROW Ma Chainage KP 17.8, Awarra for Indorama
Tagbas successfully executed the repair and section replacement of the vandalized 18" X83 km pipeline at ROW Ma Chainage KP 17.8, Awarra, for Indorama. The project involved restoring the pipeline's integrity by replacing the damaged section and implementing measures to prevent future vandalism. Tagbas utilized advanced techniques and safety protocols to ensure minimal disruption to operations and to enhance the pipeline's durability, ensuring that Indorama's supply chain remains secure and efficient.
Sabotage Repair & Replacement of Damaged Elbow/Section of Oshie NAOC 15LS/SS 4 inch Hook-Up Arm
Tagbas carried out the repair and replacement of the damaged elbow and section of the 4" hook-up arm on Oshie NAOC 15LS/SS flowlines following an act of sabotage. The project required swift response, precision engineering, and secure installations to restore the system's functionality and integrity. By employing advanced techniques and adhering to industry standards, Tagbas ensured seamless repairs while minimizing operational downtime for NAOC.
Sectional Replacement of Ebegoro 1SS & 1LS Flowlines for NAOC
Tagbas successfully executed the sectional replacement of Ebegoro 1SS and 1LS flowlines for NAOC. The project involved the removal of compromised pipeline sections and installation of high-quality flowlines to ensure uninterrupted fluid transport and enhanced operational efficiency. By adhering to stringent safety and quality standards, Tagbas delivered a reliable solution that supports the integrity and performance of NAOC's production infrastructure.
Refurbishment of Combat Post and Caravan at Samabri for NAOC
Tagbas completed the refurbishment of the combat post and caravan at Samabri for NAOC, ensuring enhanced functionality and structural integrity. The project involved upgrades to existing structures, including repairs, interior and exterior refurbishments, and improvements to meet safety and operational standards. Delivered with precision and attention to detail, the project reinforced Tagbas's commitment to quality and client satisfaction.
Construction of Slab Works Around Unit 720 API Skimmer at OB/OB Gas Plant, NAOC
Tagbas successfully executed the construction of slab works around Unit 720 API Skimmer at the OB/OB Gas Plant. The project involved meticulous planning, reinforced concrete works, and precise execution to ensure structural stability and operational efficiency. With a strong focus on safety and quality, Tagbas delivered a durable and compliant solution that supports the functionality of the skimmer unit within NAOC's gas processing operations.
Reconstruction of 1500m Asphalt Road & Drainage at Aggah Community - NAOC
Tagbas delivered the reconstruction of a 1500m asphalt road and drainage system connecting Aggah and Okwuzi communities in ONELGA, Rivers State. The project included road rehabilitation, installation of durable drainage systems, and asphalt surfacing to improve accessibility and mitigate flooding. By prioritizing precision engineering and sustainable construction practices, Tagbas enhanced infrastructure and supported the socio-economic development of the local community.
Reconstruction of NAOC Obrikom 15&16 Manifold at Obiafu Field
Tagbas successfully completed the reconstruction of the Obrikom 15 & 16 manifolds at the Obiafu Field for NAOC. The project involved precise engineering, dismantling, and rebuilding of the manifold system to enhance operational efficiency and reliability. With a focus on safety, quality, and timely delivery, Tagbas ensured the upgraded system met industry standards and supported seamless production operations.